Sign In
Home
Guides
Government
Directory
Bingo
QUICK ACCESS
Sign In
🏗️

Building a Pole Barn or Accessory Building

Step-by-step guide to building a pole barn, garage, or accessory building in Grant Township, Clare County. Permits, setbacks, and inspections explained.
property · township
Last verified: 2026-03-25

Putting up a pole barn, detached garage, or shed is one of the most common building projects in the township. You will need approvals from two places — the township for zoning and the county for building — so plan ahead.

Steps to Get Started

  1. Check your zoning district. Call Dick Hassberger at (989) 588-9841 ext. 5 to confirm what is allowed on your parcel. Residential, agricultural, and commercial zones have different rules for accessory buildings.
  2. Know your setbacks. Accessory buildings typically must be set back a minimum distance from property lines, roads, and your primary structure. Setbacks vary by zone — Dick can tell you the exact numbers for your property.
  3. Apply for a township zoning permit. Submit the Zoning Permit Application to the township office with a site plan showing the building location, dimensions, and distances to property lines.
  4. Apply for a county building permit. Once your zoning permit is approved, contact the Clare County Building Department at (989) 539-2761. You will need construction plans, including foundation details and structural specs.
  5. Schedule inspections. The county requires inspections at key stages — typically foundation, framing, and final. Do not pour concrete or close up walls before the inspector signs off.
  6. Get your certificate of occupancy. After the final inspection passes, you are good to go.

Key Details

  • Cost: Township zoning permits are typically $50-$100. County building permits vary by project size.
  • Timeline: Allow 2-4 weeks for permit processing. Do not start building before both permits are in hand.
  • Size limits: Accessory buildings generally cannot be larger than your primary structure. Confirm the maximum allowed square footage for your zone.

Common Mistakes

  • Skipping the zoning permit. The county will not issue a building permit without township zoning approval first.
  • Building too close to the property line. This is the most common violation and can result in an order to move or remove the structure.
  • Starting work before permits are issued. Building without permits can result in fines, a stop-work order, or being required to tear down the structure.
Contacts
Dick Hassberger
Zoning Administrator
(989) 588-9841 ext. 5
Clare County Building Department
Building Inspector
(989) 539-2761
Forms & Downloads
Zoning Permit Application
Building Permit Application